Installation Guide

33
*Figures shown are with using Slatestone corners. The
same install concept is used for all corners.
2) Starter Strip- Determine the height above ground the
bottom of the column should be. Measure up 2 ¾" from this
point and strike a level line. Attach the top of the starter strip
on this line. Level and Attach starter strip on each face,
stopping 2" from each corner.
3) Each box contains 2 left (L-2,L-4)and 2 right corners
(R-1, R-3). 2 boxes are needed per 2 courses. Use 4 right pieces
for 1 course and 4 left pieces for the next course. Dry fit
corners R-1, R-3 and R-1, R-3. Slide down onto the starter strip
and attach all pieces where indicated on the screw hem.
4) Attaching the Corners- There are 3 screw points on the long
side of the corner, and 2 on the shorter end. Make sure to use 5
screws per corner. Hold the bottom edge of corner snug against the
substrate while placing the screws to prevent over tightening of
the screw hem. This prevents the bottom edge from kicking out.
5) Dry fit corners L-2, L-4 and L-2, L-4. Slide down and
attach as described above.
6) For the next course, use corner s R-3, R-1 and R
-3, R-1 to
prevent pattern repetition. Finally use corners L-4,
L-2 and L-4, L-2 for the 4th row. Continue to alter-
nate as needed until the desired height is achieved.
Note to Installer: Do not over tighten the screws
when attaching the corner pieces. When over tightened, the
corner piece will “kick out” at the bottom and create a gap. If the
gap is present, pull the corners together to minimize the gap,
then face screw through the female tongue, through the male base plate, and into the substrate.
Use a 3" deck screw for this purpose. Use NextStone™ caulk to fill screw head and
NextStone™ touch up paint for a professional finish.
Screw Placement
2nd Course
1st Course
COLUMN WRAP INSTALLATIONS
FROM FLUSH CORNERS
1) Fir out the desired column to:
Castle Rock: 13 ¾" x 13 ¾"
Random Rock: 14 ¾" x 14 ¾"
Slatestone: 12 ¾" x 12 ¾"
Stacked Stone: 13 ⅝" x 13 ⅝"