User's Manual

Document Name: MARS Box User Manual
Version No: 0.2
Company Name: NextNav, LLC.
Confidential Page 5 10/24/2013
Page 5 of 9
2 NextNav Local Beacon Commissioning
Once the NextNav Local Box is installed in the field and the installation checklist is
verified, a field technician follows the following sequence of operations to power up the
box as illustrated in Error! Reference source not found. and the following checklist can
be used for verification of completion of the steps needed.
Installation Tech checklist
1
GPS antenna connection
Yes No
2
Tx antenna connection
Yes No
3
EvDO antenna connection
Yes No
4
SBC: Ethernet port activity
Yes No
5
Rb: Rear Panel LED indicator is lit
Yes No
6
MAIA4: Rear Panel LED indicator is lit
Yes No
7
Able to browse internet from field service laptop
using Ethernet port on WAPS beacon box
Yes No
8
Enable port forwarding if not already done at
manufacturing site
Yes No
9
TX antenna LLA survey done
Yes No
10
Weather board LLA survey done
Yes No
11
GPS antenna LLA survey done
Yes No
12
Survey ground truth of the TX antenna, GPS
antenna and weatherboard
Yes No
Table 1 Commissioning Procedure Steps for Installation Technician
2.1 Equipment List
NextNav Local Beacon
FCC Approved AC/DC Adapter
Transmit Antenna (PN: MPA-806-N)
GPS Antenna (PN: BL1R-A-XTB-1-FKM)
EVDO Antenna (PN: PSKN-900/1900S)
NextNav WeatherBoard unit
RF cables as per chart below: