Use and Care Manual
36" Hybrid Composite Railing Installation Guide / v20210527US 32
The top rail insert (B) is designed for a maximum
of 71 7/8" (1825.7 mm) as shown in Diagram 28.
The railing is designed for a maximum of 73 1/8"
(1857.5 mm) as in Diagram 29.
8
The bottom rail bracket (H) should be
installed with screw (R) at 1 1/4" (32.5 mm)
and 15/16" (24 mm) from the end of the
rail which will be placed on the higher side
of the stairs as shown in Diagram 30. The
bottom rail bracket (H) should be installed
with screw (R) at 1 1/8" (28 mm) and 15/16"
(24 mm) from the end of the rail which will
be placed on the lower side of the stairs.
Alternatively, a flat board can be used to
press the bracket up against the end of rail
to line up the correct distance.
DIAGRAM 28
DIAGRAM 29
71 7/8" (1825.7 mm)
71 1/2" (1816.1 mm)
73 1/8" (1857.5 mm)
71 3/4" (1823.1 mm)
3/8" (9.7 mm)
1 3/8" (34.4 mm)
1 3/8" (34.4 mm)
3/8" (9.7 mm)
Screw (R)
DIAGRAM 30
1 1/4"
(32.5 mm)
1 1/8"
(28 mm)
15/16"
(24 mm)
15/16"
(24 mm)
7
Cut rails (A1 & A2) to the length (L1 in
Diagram 26) between the post sleeve (N)
minus 1/8" (3 mm) on each side for inserting
rail gaskets at a 32 degree angle. L1 can be
measured like L minus 1/8" (3 mm) on each
side.
If you are installing a stair railing that needs
a different configuration of balusters please
refer to page 36.
Remember to take out top rail insert (B)
before cutting top rail (A1). The top rail insert
(B) should be cut 1/4" (6 mm) shorter than the
top rail (A1).
Notes: Need to leave fixed distance
between the ends of the rail and the rst
hole of each end as shown in Diagram 26
and Diagram 27.
DIAGRAM 27
3 1/4" (83 mm)
3 7/8" (98 mm)
Top Rail (A1)
3 1/4" (83 mm)
3 7/8" (98 mm)
Boom Rail (A2)
DIAGRAM 26
post
sleeve (N)
Top Rail (A1)
Boom Rail (A2)
Top Rail (A1)
Boom Rail (A2)
1/8" (3 mm)
1/8" (3 mm)1/8" (3 mm)
1/8" (3 mm)
1/8" (3 mm)
1/8" (3 mm)
3 1/4" (83 mm)
3 1/4" (83 mm)
3 7/8" (98 mm)
3 7/8" (98 mm)
Top Rail (A1)
Boom
Rail (A2)
post
sleeve (N)
post
sleeve (N)
post
sleeve (N)