Use and Care Manual
36" Hybrid Composite Railing Installation Guide / v20210527US 21
9
Drill in the bottom post brackets (G) with
screw (P) as shown in Diagram 9.
DIAGRAM 9
10
Cut rail (A1 & A2) to the length between the
left side 45 degree connector (V) and the
right side 45 degree connector (X) minus
1/8" (3 mm) on each side for inserting the
rail gaskets (F) as shown in Diagram 10.
Remember to take out top rail insert (B)
before cutting top rail (A1). The top rail
insert (B) should be cut 1/4" (6 mm) shorter
than the top rail (A1).
Note: Need to leave a minimum 3 1/16"
(78 mm) or a maximum 3 3/8" (85 mm)
between the end of the rail and the rst
hole of each ends as shown in Diagram 11.
Now please refer to the regular straight
railing installation guide starting from Step
7 of page 14 to nish the rest of the railing
installation.
DIAGRAM 11
DIAGRAM 10
Wood Saw
Wood Saw
Metal Saw
Wood Saw
Wood Saw
Metal Saw
Top Rail (A1)
Boom Rail (A2)
Top Rail Insert (B)
3 1/16" (78 mm) ≤ L ≤ 3 3/8" (85 mm)