Instructions / Assembly
36" Hybrid Composite Railing Installation Guide / v20170720 8
9
Attach the bottom rail (A-UR02) onto the
bottom post brackets (G-R0205) as shown
in diagram 16.
10
Install the baluster plugs (E-LV-0218-B)
and aluminum balusters (M-R0218-36) as
shown in diagram 17.
11
Attach the galvanized adaptors (C-LV-0210)
on both ends of the galvanized insert (B-
LV-0209) as shown in diagram 18.
7
The bottom bracket (H-R0204) should be
installed with screw WJ0149 at 29.5 mm
(1.2") and 24 mm (1") from the ends of the
rail as shown in diagram 13. Alternatively, a
at board can be used to press the bracket
up against the end of rail to line up the
correct distance.
DIAGRAM 13
Screw WJ0149
8
Pre-drill and install the foot blocks (I-R0222)
with screw WJ0149 on the bottom rail as
shown in diagram 14. Foot blocks should be
evenly spaced out depending on the length
of the final rail and cannot be installed
underneath a pre-drilled baluster hole.
Note: Top rail is A in diagram 15. The holes
should be facing downwards. Boom rail is
B in diagram 15. The holes should be facing
upwards.
DIAGRAM 16
DIAGRAM 17
DIAGRAM 18
A
B
DIAGRAM 15
Screw WJ0149
DIAGRAM 14










