Instructions / Assembly

36" Hybrid Composite Railing Installation Guide / v20170720 7
D-R0211 with
screw WJ0130
G-R0205 with
screw WJ0131
5
Lower the post skirt (K-LV-0119) over the
post sleeve (N-UH35) as shown in diagram 8.
Drill in the top post brackets (D-R0211) with
screw WJ0130 as shown in diagram 9.
Drill in the bottom post brackets (G-R0205)
with screw WJ0131 as shown in diagram 10.
DIAGRAM 8 DIAGRAM 9
DIAGRAM 12DIAGRAM 10
6
Cut rail (A-UR02) to the length between the
post sleeve (N-UH35) minus 3 mm (0.118")
on each side for inserting the gaskets (F-
R0102) as shown in diagram 11.
Remember to take out galvanized insert (B-
LV-0209) before cutting rail (A-UR02). The
galvanized insert (B-LV-0209) should be cut
6mm shorter than the rail (A-UR02).
Note: Need to leave at least 75 mm (2.953")
between the ends of the rail and the first
hole of each end as shown in diagram 12.
DIAGRAM 11