Instructions / Assembly
36" Hybrid Composite Railing Installation Guide / v20170720 12
1
Mark where the post mount (J-R0215-36)
will be installed. The maximum distance
of the post mount is 1645 mm (64.8") as
shown in diagram 1.
2
Cut post mount (J-R0215-36), which will be
placed on the top, to the length of 937 mm
(36.9") as shown in diagram 2. The post
mount on the lower side DO NOT need to
be cut.
Cut the post sleeve (N-UH35), which will
be placed on the top, to the length of 991
mm (39") as shown in diagram 3. The post
sleeve on the lower side DO NOT need to
be cut.
4
First, mark on the post which will be on
the stair top using the "Stairs - Top Post"
cardboard template. Use the top 4 holes
for top post brackets and use the bottom 2
holes for the bottom post brackets.
Then, pull a string down at a 32 degree
angle for locating the "Stairs - Bottom Post"
cardboard template on the stair bottom
post as shown in diagram 6.
Note: The cardboard template location
should be measured from the boom.
DIAGRAM 1
DIAGRAM 2
DIAGRAM 3
DIAGRAM 4 DIAGRAM 5
3
Install the post mount (J-R0215-36) as
diagram 4.
Note: Screw WJ0094 is used when installed
on concrete. Screw WJ0096 is used when
installed on wood.
Install the post sleeve (N-UH35) as shown
in diagram 5.