Installation Guide
36" Hybrid Composite Railing Installation Guide / v20181120 22
R-WJ0143
17
Pre-drill and  install with  screw (R-WJ0143) 
as shown in diagram 35.
DIAGRAM 35
19
If needed adjust the foot blocks (I-R0217) to 
the correct height as shown in diagram 37.
DIAGRAM 37
18
Install the post cap (L-LV-0120) and gaskets 
(F-R0113, O-R0115) as shown in diagram 36.
F-R0113
O-R0115
DIAGRAM 36
20
Install the post  cap (L-LV-0120) with screw 
(V-WJ0153) as shown in diagram 38.
V-WJ0153
DIAGRAM 38










