Installation Guide
36" Hybrid Composite Railing Installation Guide / v20181120 19
6
Pre-drill post bracket holes with a 3 mm 
(7/64 inch) bit as shown in diagram 18.
Lower the post skirt (K-LV-0119) over the post 
sleeve (N-UH35) as shown in diagram 19.
DIAGRAM 18 DIAGRAM 19
D-R0225 with 
P-WJ0130
G-R0205 with 
Q-WJ0131
8
Cut  rails  (A-UR02)  to  the  length  (L1  in 
diagram 22)  between the  post  sleeve (N-
UH35) minus 3 mm (0.118") on each side for 
inserting gaskets at a  32  degree angle. L1 
can be measured like L minus 3 mm (0.118") 
on each side.
Remember to take out galvanized insert (B-
R0224-1)  before  cutting  rail  (A-UR02). The 
galvanized insert (B-R0224-1) should be cut 
6 mm shorter than the rail (A-UR02).
7
Drill in the top post brackets (D-R0225) with 
screw (P-WJ0130) as shown in diagram 20.
Drill in the bottom post  brackets (G-R0205) 
with screw (Q-WJ0131) as shown in diagram 21.
DIAGRAM 20 DIAGRAM 21
DIAGRAM 22
DIAGRAM 17










