Installation Guide
36" Hybrid Composite Railing Installation Guide / v20181120 18
DIAGRAM 16
4
Install the post sleeve (N-UH35) as  shown 
in diagram 16.
5
First, mark on the post which will be on 
the stair top using the  "Stairs - Top Post" 
cardboard template. Use the top 4  holes 
for top post brackets and use the bottom 2 
holes for the bottom post brackets. 
Then,  pull a  string  down  at  a  32  degree 
angle for locating the "Stairs - Bottom Post" 
cardboard template on the stair bottom 
post as shown in diagram 17. 
Note: The cardboard template location 
should be measured from the boom.
U-WJ0155
DIAGRAM 14
DIAGRAM 15
e. Tighten the lag bolts with washers underneath 
the substrate as shown in Diagram 15.
d. Put the post back over the predrilled holes and 
insert the screws (U-WJ0155) lag bolts into place 
as shown in Diagram 14.










