Installation Guide

36" Hybrid Composite Railing Installation Guide / v20181120 11
DIAGRAM 25
8
The bottom bracket (H-R0204) should be
installed with screw (R-WJ0149) at 29.5 mm
(1.2") and 24 mm (1") from the ends of the
rail as shown in diagram 24. Alternatively, a
at board can be used to press the bracket
up against the end of rail to line up the
correct distance.
DIAGRAM 24
R-WJ0149
9
Pre-drill and install the foot blocks (I-R0222)
with screw (R-WJ0149) on the bottom
rail as shown in diagram 25. Foot blocks
should be evenly spaced out depending on
the length of the final rail and cannot be
installed underneath a pre-drilled baluster
hole.
Note: Top rail is A in diagram 26. The holes
should be facing downwards. Boom rail is
B in diagram 26. The holes should be facing
upwards.
DIAGRAM 29
R-WJ0149
10
Attach the bottom rail (A-UR02) onto the
bottom post brackets (G-R0205) as shown
in diagram 27.
11
Install the baluster plugs (E-LV-0218-B)
and aluminum balusters (M-R0218-36) as
shown in diagram 28.
DIAGRAM 27
DIAGRAM 28
12
Attach the galvanized adaptors (C-R0224-
2) on both ends of the galvanized insert (B-
R0224-1) as shown in diagram 29.
A
B
DIAGRAM 26