Installation Guide
36" Hybrid Composite Railing Installation Guide / v20181120 9
DIAGRAM 16
4
Install the post sleeve (N-UH35) as shown
in diagram 16.
DIAGRAM 18
DIAGRAM 14
DIAGRAM 15
e. Tighten the lag bolts with washers underneath
the substrate as shown in Diagram 15.
d. Put the post back over the predrilled holes and
insert the screws (T-WJ0155) lag bolts into place
as shown in Diagram 14.
DIAGRAM 17
5
Mark where the post brackets will be
installed with the "Straight Railing"
cardboard template as shown in diagram 17.
Use the top 6 holes for top post brackets
and use the bottom 2 holes for the bottom
post brackets as shown in diagram 18.
Note: The cardboard template location
should be measured from the boom.
Pre-drill post bracket holes with a 3 mm
(7/64 inch) bit.
T-WJ0155










