Installation Guide
36" Hybrid Composite Railing Installation Guide / v20181120 15
1
Mark where the post mount (J-R0221-36)
will be installed. The maximum distance
of the post mount is 1645 mm (64.8") as
shown in diagram 1.
2
Cut post mount (J-R0221-36), which will be
placed on the top, to the length of 937 mm
(36.9") as shown in diagram 2. The post
mount on the lower side DO NOT need to
be cut.
Cut the post sleeve (N-UH35), which will
be placed on the top, to the length of 991
mm (39") as shown in diagram 3. The post
sleeve on the lower side DO NOT need to
be cut.
DIAGRAM 1
DIAGRAM 2
DIAGRAM 3
DIAGRAM 4
DIAGRAM 5
3
Install the post mount (J-R0221-36) as
shown in diagram 4-15.
Note: Screw WJ0094 is used when installed
on concrete. Screw WJ0155 is used when
installed on wood.
Installing on a concrete surface
a. First position the post with the metal base in
the position of installation. Then use a marker
or pencil to mark the drilling hole positions as
shown in Diagram 4.
b. Now take a drill and drill in the spots marked
previously as shown in Diagram 5.










