Instructions / Assembly

Table Of Contents
59
1
2
DrillToekick
Ø3.5X16
wood screws
SawMiter Box
L
L
A
B
Parts required
Cut the Toekicks to required length using a
hand saw and a miter box..
Measure the length of toekicks needed for
each set of cabinets and cut the toekick
using a hand saw.
Place toekick closer to the legs and mark
the position of legs on to the toekick for
installation of feet clamps.
Install feet clamps on the toekicks as per the markings.
1
3
4
Installing the Toe kicks