Installation Guide
Table Of Contents
- NEWAGE PRODUCTS INC. OUTDOOR KITCHEN PLATINUM PIZZA OVEN MANUFACTURER WARRANTY
- Safe Operating Practices
- Parts Supplied
- Tools Needed
- Product Inspection
- Product Specifications
- Installing Pizza Oven on NewAge Cabinet & Carts
- Installing Pizza Oven on custom built cabinet
- Assembling the Pizza Oven
- Leak Testing Instructions
- Fixing a Gas Leak
- Connection to AC
- Optional Accessories
- Pre-Operating Checklist
- Operating the Pizza Oven
- Proper Burner Position and Operation
- Pizza Oven Maintenance and Cleaning
- Troubleshooting
- Electrical Wiring Diagram
- Exploded View and Spare Parts
- GARANTIE DU FABRICANT DU FOUR À PIZZA PLATINUM OUTDOOR KITCHEN
- Pratiques d’exploitation sûres
- Pièces fournies
- Outils requis
- Inspection du produit
- Spécifications du produit
- Installation d’un four à pizza sur un meuble et un chariot NewAge
- Installation d’un four à pizza sur un meuble construit sur mesure
- Assemblage du four à pizza
- Instructions de Test d’Étanchéité
- Réparer une fuite de Gaz
- Connexion au CA
- Accessoires optionnels
- Liste de contrôle préfonctionnement
- Liste de contrôle préfonctionnement
- Utilisation du four à pizza
- Position et fonctionnement corrects du brûleur
- Entretien et nettoyage du four à pizza
- Remplacement des ampoules
- Dépannage
- Schéma de câblage électrique
- Vue éclatée et pièces de rechange
23
Assembling the Pizza Oven
Instructions for Installer
Gas Line Purging
You should purge the gas line of air before attempting to light the Pizza Oven.
• Make sure all Pizza Oven controls are in the “OFF” position.
• Slowly turn on the main gas supply.
• Open the Door for the entire purging procedure.
• Push in the control knobs (do not turn) for the burner on the furthest right for about 20 seconds
to allow the air in the system to purge. These are furthest from the fuel source and will completely
purge the lines. Release the control knobs. Wait at least 5 minutes after releasing the control before
attempting to light the burners.
Gas Hook-Up Instructions
The piping up to the gas Pizza Oven is the responsibility of the installer and piping should be
located as shown in the built-in instructions. It must be connected with rigid pipe, copper tube or
an approved exible metal connector which complies with ANSI Z21.24/ CSA 6.10 or ANSI Z21.75/
CSA 6.27.
The installation must comply with CAN B149.1 Natural Gas and Propane installation code in Canada,
or to the National Fuel Gas code, ANSI Z223.1 in the United States. The gas supply pipe must be
suciently sized to supply the BTU/h specied on the rating plate, based on the length of the piping
run. If installing a side burner, a separate line must be branched o to the side burner unit and enter
the side burner opening at the specied location. The enclosure must be ventilated according to
local codes, and must not have communication with the cavity used to enclose the gas Pizza Oven.
CUSTOM BUILT IN ENCLOSURE VENTILATION REQUIREMENT
1. At least one unobstructed ventilation opening on the exposed exterior side of the enclosure
located within 5 in (127mm) of the top of the enclosure. The opening must have a total free area of
more than 20 in2 (130 cm2).
2. At least one ventilation opening on the exposed, exterior side of the enclosure located 1 in (25.4
mm) or less from the oor level. The opening must have a total free area of more than 20 in2 (130
cm2). The upper edge must be no more than 5 in (127 mm) above the oor level.
Every opening must be large enough to permit the entrance of a 1/8 in (3.2 mm) rod.
The enclosure must be designed so that the gas hose can be connected, disconnected and the
connections inspected and tested outside the enclosure. All connections must be accessible
for testing inside the enclosure connections inspected and tested outside the enclosure. All
connections must be accessible for testing inside the enclosure.
ONLY LICENSED GAS FITTERS MUST PERFORM THE REQUIRED GAS FITTING ON NEWAGE
GAS APPLIANCES. TO ENSURE SATISFACTORY PERFORMANCE, THE GAS SUPPLY LINE MUST
BE SIZED TO ACCOMMODATE THE TOTAL BTU/H REQUIREMENTS OF ALL THE GASFIRED
EQUIPMENT THAT WILL BE CONNECTED TO THAT LINE. IN NO CASE SHOULD PIPE LESS THAN
3/4” INSIDE DIAMETER OR 1” OUTSIDE DIAMETER EVER BE USED TO CONNECT THIS PRODUCT.
WARNING