Install Instructions
25
Lift "H"
(See Figure)
Maximum Length of Tubing
"H" + "R" (See Figure)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0' 93' 100'
2' 85' 100'
4' 77' 100'
6' 69' 100'
8' 60' 100'
10' 52' 100'
12' 44' 100'
14' 36' 100'
16' 27' 100'
18' --- 76'
TABLE 6: TWO-STAGE UNITS (3450 RPM)
TWO-PIPE SYSTEMS
Lift "H"
(See Figure)
Maximum Length of Tubing
"H" + "R" (See Figure)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0' 84' 100'
1' 78' 100'
2' 73' 100'
3' 68' 100'
4' 63' 100'
5' 57' 100'
6' 52' 100'
7' 47' 100'
8' 42' 100'
9' 36' 100'
10' 31' 100'
11' 26' 100'
12' 21' 83'
13' --- 62'
14' --- 41'
TABLE 5: SINGLE STAGE UNITS (3450 RPM)
TWO PIPE SYSTEMS
Figure 20: Two Pipe Oil Lines
III: INSTALLATION INSTRUCTIONS (continued)
Be sure that all oil line connections are absolutely
airtight. Check all connections and joints. Flared
ttings are recommended. Do not use compression
ttings.
Open the air-bleed valve and start the burner. For clean
bleed, slip a 3/16" ID hose over the end of the bleed
valve and bleed into a container. Continue to bleed for
15 seconds after oil is free of air bubbles. Stop burner
and close valve.










