Install Instructions

10
Figure 3: Minimum Installation Clearances To Combustible Materials (Inches)
NOTE 1: Listed clearances comply with American National
Standard NFPA 31, Standard for the Installation of Oil
Burning Equipment.
NOTE 2: CL Series boilers can be installed in rooms with
clearances from combustible material as listed above.
Listed clearances cannot be reduced for alcove or closet
installations.
NOTE 3: For reduced clearances to combustible material,
protection must be provided as described in the ANSI/NFPA
31 standard.
C
A
Above
B
Front
Chimney
Connector
D
Rear
E
Sides
6 24 18 6 6
4. PROVIDE SERVICE CLEARANCE of at least
24” clearance from front jacket panel for servicing
and removal of front tankless heater. If boiler is
equipped with a rear tankless heater, provide at
least 24" service clearance on the right side of the
boiler. Boiler ueways may be cleaned either from
the top or from the right side. Provide at least 24"
clearance from either the right side of the boiler or
the top of the boiler for cleaning ueways.
5. For minimum clearances to combustible materials.
See Figure 3.
NOTICE
Clearance to venting is for single wall vent
pipe. If Type L vent is used, clearance may be
reduced to the minimum required by the vent pipe
manufacturer.
C. PROVIDE COMBUSTION AND VENTILATION
AIR. Local and National Codes may apply and should
be referenced.
A. INSPECT SHIPMENT carefully for any signs of
damage.
1. All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of crated boiler to the carrier in good condition.
2. Any claims for damage or shortage in shipment
must be led immediately against the carrier by
the consignee. No claims for variances from,
or shortage in orders, will be allowed by the
manufacturer unless presented within sixty (60)
days after receipt of goods.
B. LOCATE BOILER near nal position before removing
crate. See Figures 1A thru 1D. Using hand truck or
pipe rollers under skid, move boiler into position along
side installation site.
1. LOCATE so that vent pipe connection to chimney
will be short and direct.
2. BOILER IS SUITABLE FOR INSTALLATION
ON COMBUSTIBLE FLOOR. Boiler cannot be
installed on carpeting.
3. FOR BASEMENT INSTALLATION, provide
a solid elevated base, such as concrete, if oor is
not level, or if water may be encountered on oor
around boiler.
II: PRE-INSTALLATION