Instructions / Assembly

INSTALLATION
1. Neutra-Safecondensateneutralizersincludebuilt-inunionswith
1
/2"NPTtappingsateitherend.
2. ApplyTEFLON TAPE ONLYtothethreadsofprovidedPVCsocketadaptorsandattachtoneutralizer.
*DO NOT OVER TIGHTEN*
Over tightening can crack the end cap and create a leak. If over tightening should occur, replacement end caps
and lock rings are available for purchase. Over tightening is not covered under warranty.
3. Identifysuitablelocationforassembledcondensateneutralizer.Observedirectionofowasindicatedonneutralizer.
4. Positionandsecurethemountingbrackets.
5. PrimeandgluePVCpipetottings.
Note: If using exible tubing, be sure to use hose clamps at barb ttings.
Note: It is recommended that PVC pipe be used wherever possible as this will reduce any risk of tube kinking.
CN2-220V includes: (2) -
1
/2" MPT x FPT 90’s
(2) -
1
/2" MPT x Slip Adaptors
(2) -
1
/2" MPT x
3
/4" Slip Adaptors
(2) - Snap in brackets
This allows many combinations for both vertical & horizontal installations.
6. RoutePVCpipeortubingtodrainorpump,maintainingapitchof
1
/4"perfoot.
7. Ifthecondensingappliancedoesnothaveprovisionsforairadmittanceaftertheinternalcondensatetrap,itmaybenecessarytoaddan
atmosphericventinthedrainlinebeforetheneutralizer.
8. Fillcondensatetrapwithwateruntilowisestablishedthroughneutralizer.
9. Observeneutralizerduringboileroperationtoensureunrestrictedcondensateow.
MAINTENANCE
1. Allserviceitemsshouldbeundertakenbyaqualiedprofessional.
2. Visuallyinspectunitforsignsofleakingordamage.
3. NeutralizermediashouldbereplacedatleastonceayearorwhenpHfallsbelowlocalregulations.
NeutralizerefciencycanonlybedeterminedbymeasuringpHlevelofcondensateoutowwithaqualitypHmeter.
4. Unscrewunionsatbothendsofneutralizer.Ifnecessary,rotatecartridgetoreleaseO-ring.
5. Removecartridgeanddisposeofoldmedia.Rinseinsideofcartridge.Addreplacementmedia.
Replacementmediakit#22RCK-S.
6. ChecktomakesurethatO-ringsareinplacebeforereinstallingcartridge.Stainlesssteelscreenmustbeoninletofcartridge
whenreinstalling.Do not over-tighten. (see above)
7. Primeuegastrapwithaminimumof1gallonofwater.
8. Observeneutralizerduringboileroperationtoensureunrestrictedcondensateow.
NOTE: Caution do not lose the O-rings at either end of cartridge.
NS-VCNIOM3-19-2020