Network Device Brochure

Unpacking and inspecting the parts
Chapter 2 Installing Your GigaStor
18
rev. 1
The general steps to install your GigaStor are:
F “Unpacking and inspecting the parts” on page 18
F “Installing the GigaStor and connecting the cables” on page 19
F “Connecting Observer to the GigaStor” on page 22
Additional steps to complete the installation are:
F “Configuring Observer for your Gigabit device” on page 31
F “Configuring Observer for your WAN device” on page 33
F “Tapping an Ethernet or Fibre Channel connection” on
page 37
F “Tapping a WAN connection” on page 42
F “Installing the drives in your GigaStor” on page 50
Unpacking and inspecting the parts
Your GigaStor includes a number of components. Take a moment
after unpacking the kit to locate all of the parts.
F One rack-mountable GigaStor system with an installed 10/
100/1000 Ethernet network interface (management) card.
F Appropriate capture interface (Gen2 or WAN).
F The rack unit may also include a rail kit depending on
which model was purchased.
F Windows XP 64-bit operating system and a restore DVD
specific for your GigaStor.
F TAP kits for your topology (Ethernet, Fibre Channel, or
WAN), except for the GigaStor 2TE.
F Cables
F Ethernet cable for each 10/100/1000 interface in your
GigaStor.
F Connection cables to connect your GigaStor to a TAP or
switch.