User manual

M-FE116NA-1 QCARD
Before you begin installing the hub, prepare the installation site. Make sure your
operating environment meets the operating environment requirements of the
equipment.
Place the Model FE116 hub on a at surface or mount it on a wall with the
hardware included in the wall mount kit. Be sure the hub is positioned with at
least 2 inches of space on all sides for ventilation.
You can connect any device equipped with a 100BASE-T Ethernet interface to
the RJ-45 ports on the Model FE116 hub. These standard RJ-45 ports accept
either 2-pair or 4-pair Category 5 UTP cable (100BASE-TX networks require
only 2-pair wiring). The RJ-45 interface is an 8-pin connector.
To connect any of the RJ-45 ports on your Model FE116 hub to a PC, use a
regular straight-through UTP cable. If you are connecting using Port 16 on your
hub, set the Normal/Uplink push button to Normal.
Characteristic Requirement
Temperature Ambient temperature between 0
°
and 40
°
C (32
°
and
104
°
F).
No nearby heat sources such as direct sunlight, warm air
exhausts, or heaters.
Operating humidity 90% maximum relative humidity, noncondensing.
Ventilation Minimum 2 inches (5.08 cm) on all sides for cooling.
Adequate airflow in room or wiring closet.
Operating conditions At least 6 feet (1.83 m) to nearest source of
electromagnetic noise (such as photocopy machine or arc
welder).
Service access Minimum 12 inches (19.68 cm) front and back for service
access and maintenance.
Front and back clearance for cables and wiring hardware
such as punchdown blocks.
Power Adequate power source within 6 feet (1.83 m).
Wiring hardware Wiring hardware, such as punchdown blocks or patch
panels, should be complete before installing the hub.
Installation Procedures
Prepare the Site
Installation
Connecting Devices