Quick Start Manual

Installation Overview
10
ReadyDATA 5200
11. Using the left rail, pull the middle rail out of the front of the outer rail, ensuring that the ball
bearing shuttle is locked at the front of the middle rail.
12. Repeat Step 11 with the right rail.