1. Set up the switch
Prepare the installation site so that mounting, access, power source, and
environmental requirements are met. For more information about these
requirements, visit www.netgear.com/support.
To set up the switch:
1. Install the switch using one of the following methods:
Placed on a at surface
Attached to a wall
Attached to a rectangular or round pole or table leg
Installed in a rack
Follow the installation instructions in the hardware installation guide.
2. Apply AC power.
The Power LED lights solid yellow while the switch conducts a power-on self-
test (POST). After the switch passes the POST, the Power LED lights solid green,
and the switch is functional. If the Power LED does not light green, see the
following troubleshooting tips:
If the POST fails, the Power LED remains solid yellow. See the
troubleshooting section of the hardware installation guide for more
information.
If the Power LED does not light at all, check to see that the power cable is
plugged in correctly and that the power source is functioning. If this action
does not resolve the problem, see the troubleshooting section of the
hardware installation guide for more information.