Installation Manual

4-1
v1.1, April 2010
Chapter 4
Installation
This chapter describes the installation procedures for your NETGEAR GS108T Gigabit Smart
Switch. Switch installation involves the following steps:
1. Prepa
ring the site
2. App
lying footpads and wall mounting
3. Checking the
installation
4. Connecting devices to the switch
5. App
lying power
6. Switching
management through a Web Browser or Utility Program (initial configuration)
Step 1: Preparing the Site
Before you install your switch, ensure that your operatin
g environment meets the environmental
requirements in Table 4-1.
Table 4-1. Site Requirements
Characteristics Requirements
Mounting
Installations Desktop: provide a flat table or shelf surface
Wall-mount: select a
location (see “Access”). You also need the mounting
screws supplied with your switch.
Access Locate the switch in a position that lets you access the front panel RJ-45
ports, view the front panel LEDs, and access power connector.
Power source Provide a power adapter (included)
a
a. Power specifications for the switch are shown in Appendix B, “Technical Specifications”
. Ensure that the AC outlet is not
controlled by a wall switch, which can accidentally turn off power to the outlet
and the switch.