GC510P-GC510PP Hardware Installation Guide

4
Installation
This chapter describes the installation procedures for the switch. Switch installation involves the steps described
in the following sections:
Step 1: Prepare the Site
Step 2: Protect Against Electrostatic Discharge
Step 3: Unpack the Switch
Step 4: Install the Switch
Optional Step 5: Install SFP Transceiver Modules
Step 6: Connect Devices to the Switch
Step 7: Check the Installation
Step 8: Apply Power and Check the LEDs
Step 9: Manage the Switch
22