GC108P-GC108PP Hardware Installation Guide

4
Installation
This chapter describes the installation procedures for the switch. Switch installation
involves the steps described in the following sections:
Step 1: Prepare the site
Step 2: Protect against electrostatic discharge
Step 3: Unpack the switch
Step 4: Install the switch
Step 5: Connect devices to the switch
Step 6: Check the installation
Step 7: Apply power and check the LEDs
Step 8: Manage the switch
23