
3. Connect hot and cold water inlet
pipes
4. Each pipes shall be pressure
tested to ensure no leakage
5. Waiting the wall to be tiled
6. As shown in figure,
install the handle
7. Install the outlet pipe well
8.Installation complete
Installation drawing Installation drawing
Installation drawing
1
2