Instructions / Assembly

Assembly of the trampoline Mat
To assemble the trampoline Mat, use the
Spring Tool (#8) to load on the Springs (#7)
and connect it to the Top Frame (#3), as
shown in Figure 2.1
2.2
Start point
Place the trampoline Mat (#1) on the floor in the middle of the
frame assembled.
Select a starting point (point ) in the frame and load on the
first Spring(#7). To keep the tension on the mat balanced, then
go to the opposite site to load on the second spring on point
, then point , then point , and so on.
Continue to attach the remaining springs in the middle of the
previously attached springs until all springs are installed.
Spring(# 7)
Triangular Rings
Trampoline Mat(# 1)
Top fram e(# 3)
Spring Tool (# 8)
Point
1
0
2.1