Installation Instructions

Chapter 5: Pit Installation
28
R900 cellular endpoint Wall and Pit MIU Installation and Maintenance Guide
6. Slide the endpoint housing onto flange tube with the face of the endpoint housing
toward the pit lid until the face of the endpoint is touching the underside of the lid.
7. Thread the locking nut onto the flange tube, with the unthreaded end toward the lid
until it is loosely touching the endpoint housing.
8. Rotate the endpoint horizontally as needed to fit into the meter pit and finish
tightening the locking not to secure the endpoint in place.