Installation Instructions

R900 cellular endpoint Wall and Pit MIU Installation and Maintenance
21
Chapter 4: Wall
Installation
12.
Verify that the meter reading is valid. If the meter reading is:
Valid, continue with the next step.
Invalid, verify all endpoint to register connections and test the installation again.
< Image Placeholder>
Figure 23 Meter Readings
If the signal strength displayed is Excellent or Good, the cellular coverage is
adequate. If the signal strength is Fair, or Poor, cellular connectivity may be
impacted.