Tying the Cable and Magnet Swiping the L900 MIU
Complete the following steps to tie the cable and magnet swipe
the .L900 MIU.
1. Place the L900 MIU in the pit location using the
following suggestions.
l In a shallow pit application, you can place the L900
MIU beside the meter.
l In deep pit applications, use a cable tie to suspend the
L900 MIU from the antenna shaft, as shown in Figure
31.
Figure 31 – L900 MIU Attached to Antenna
Be careful not to lodge the L900 MIU between the meter
box and any components inside the box.
Make sure the L900 MIU is placed in such a way that it
does not lodge itself when the pit lid is removed.
Figure 32 – Magnet Swipe the L900
MIU
2. Swipe the L900 MIU with a magnet.
l Position the magnet against the left side of the L900
MIU directly in line with the Neptune logo.
l Move the magnet up and over the top left corner of
the L900 MIU. See Figure 32.
22 L900 MIU Pit Installation and Maintenance Guide
Chapter 4: Pit Installation