Connecting the Splice Tube
To finish the installation of the Scotchloks, complete the
following steps to install the connector king splice tube.
Figure 28 – Splice Tube
1. Take all three connected Scotchloks and push into the
splice tube until fully encapsulated by the silicone
grease. See Figure 28
Figure 29 – Gray Wire in Slots
2. Separate each gray wire and place in the slots on each
side as shown in Figure 29.
Figure 30 – Cover in Place
3. Snap cover closed to finish the installation as shown in
Figure 30.
L900 MIU Pit Installation and Maintenance Guide 21
Chapter 4: Pit Installation