User Manual
Table Of Contents
- 72126503 - Exhibit Cover
- For FCC_IM_L900 Pit_09262017
- L900⢠MIU Pit Installation and Maintenance Guide
- Copyright
- Chapter 1: Product Description
- Chapter 2: L900 Specifications
- Chapter 3: General Installation Guidelines
- Chapter 4: Pit Installation
- Chapter 5: Data Logging Extraction
- Chapter 6: Maintenance and Troubleshooting
- Chapter 7: Contact Information
- Glossary
- Index
- Neptune Locations
L900 MIU Pit Installation and Maintenance Guide 13
Chapter 4: Pit Installation
This chapter describes storage and unpacking instructions, preliminary tests, tools,
materials, site selection, and pit installation of the L900 MIU.
Prior to Installation
Storage
Upon receipt, inspect shipping containers and contents for damage prior to storage.
After the inspection is complete, store the cartons in a clean, dry environment.
Keep in mind that the L900 MIU has an internal battery. Storage for more than one
year can affect product life. Be sure to use a first-in first-out inventory control
system. See "Environmental Conditions" on pageî4
Unpacking
As with all precision electronic instruments, the L900 MIU must be handled
carefully; however, no additional special handling is required.
After unpacking the L900 MIU, inspect it for damage. If the L900 MIU appears to
be damaged or proves to be defective upon installation, notify your Neptune sales
representative. If one or more items requires reshipment, use the original cardboard
box and packing material.
Figure 10 îâ L900 MIU Kit