User Manual

Table Of Contents
7. Thread the cable around the strain relief posts of the encoder.
See Figure 7.
Figure 7 – Cable Threaded Around Strain Relief Posts
8. Apply sealant liberally and ensure that it encapsulates the
terminal screws and exposed wires. See Figure 8.
Neptune requires Novaguard G661 sealant or Dow Corning
compound 4.
Figure 8 – Application of the Sealant
Any leak point can cause a reading failure in a submerged
meter setting.
L900 MIU Pit Installation and Maintenance Guide 11
Chapter 3: General Installation Guidelines