User Manual
Table Of Contents
- 72126503 - Exhibit Cover
- For FCC_IM_L900 Pit_09262017
- L900™ MIU Pit Installation and Maintenance Guide
- Copyright
- Chapter 1: Product Description
- Chapter 2: L900 Specifications
- Chapter 3: General Installation Guidelines
- Chapter 4: Pit Installation
- Chapter 5: Data Logging Extraction
- Chapter 6: Maintenance and Troubleshooting
- Chapter 7: Contact Information
- Glossary
- Index
- Neptune Locations
Item Description/Recommendation Use
Cable Solid 3 Conductor #22 AWG
(black/green/red) Part # 6431-
352
Connect L900 MIU to encoder register.
Moisture Protection
Compound
Novaguard sealant
Part# 96018-072
Cover exposed wires and terminal screws on
register and L900 MIU.
Scotchloks Part# 8138-125 Connect replacement pit L900 MIU to
encoder register.
Site Work Order Documentation provided by your
utility
Receive and record information about the
work site.
Table 6 – Recommended Materials
Safety and Preliminary Checks
Observe the following safety and preliminary checks before and
during each installation.
l Verify that you are at the location specified on the site work
order.
l Verify that the site is safe for you and your equipment.
l Notify the customer of your presence and tell them you need
access to the water meter.
l Write in the ID number(s) of the L900 MIU you are about to
install, if the site work order does not have an L900 MIU ID
number.
l Verify that the ID number(s) matches the IDnumber(s) on the
L900 MIU you are about to install, if the site work order
already has a L900 MIU ID number.
Verifying/Preparing the Encoder Register
The L900 MIU is designed for use with the following encoder
registers:
l ARB V
l ProRead
8 L900 MIU Pit Installation and Maintenance Guide
Chapter 3: General Installation Guidelines