4. Verify the signal strength. If the signal strength is:
l Acceptable, continue to the next procedure.
l Not acceptable, move the CMIU to another location to improve the signal strength and
test the installation again.
Figure 22 – Signal Strength
Verifying the Meter Reading
To verify the meter reading, complete the following steps.
1. From the CMIUManager menu, select Meter.
2. Verify that the meter reading is valid. If the meter reading is:
l Valid, continue with the next step.
l Invalid, verify all connections and test the installation again.
Figure 23 – Meter Readings