Maintenance Guide

3. Position the magnet against the left side of the CMIU directly in line with the Neptune
logo.
4. Move the magnet up and over the top left corner of the CMIU.
Figure 18 – Swiping the CMIU
Testing the Installation
The CMIU Manager is used to verify cellular signal strength and meter reading to ensure that
the CMIU is installed correctly.
Figure 19 – CMIU Manager Options
To test the installation, complete the following steps. Before testing, be sure to swipe the
CMIU with a magnet. For more information, see "Completing and Testing the Installation" on
the previous page.
1. Open the CMIU Manager on an iOS device.
Cellular MIU (CMIU™) Pit and Wall Installation and Maintenance Guide 19
Chapter 4: Wall Installation