Maintenance Guide
Table Of Contents
Figure 10 – CMIU™ Back Plate
Figure 11 – CMIU™ Wall Kit
Tools and Materials
"Tools and Materials" on page7 shows the recommended tools and materials you need to
successfully install the CMIU.
Some items may not apply to your specific installation, or the list does not contain all
required tools or materials.
Site Selection
Always follow your company's safety practices, and installation guidelines when installing a
CMIU. Never perform an installation during a lightning storm or under excessively wet
conditions.
Installation and operation in moderate temperatures increase reliability and product life. For
more information, see "Environmental" on page4.
Follow these guidelines when selecting a location to install the CMIU.
l Mount the CMIU on the outside of the building.
l Install the CMIU approximately 5 feet above the ground.
l Install the CMIU in a vertical and upright position.
l Mount the CMIU on a flat surface like a wall, but it can also be mounted on a pipe.
14 Cellular MIU (CMIU™) Pit and Wall Installation and Maintenance Guide
Chapter 4: Wall Installation