Installation & Assembly

D i s a s s e m b l e t h e d ra i n
coupling,install the base to the
waste pipe and secure it in place.
If use PVC pipe,glue with PVC
cement.If use No-Hub rubber
coupling, fasten with screw
driver.
Stuff a rag into the drain
opening. Apply oor mortar to
build up the shower pan liner,
the surface should be slope of
,approx 1/4" per foot toward
the drain. Allow the mortar to
cure 12 hours.
Slope
2
Slope
Slope
Slope
4
3
Press the waterproof membrane
down around the bolts,use
utility knife to cut a slit for the
bolts to poke through,
afterwards cut away the waste
hole in the center.
Partially loose the drain bolts,
install the coupling plate,
tightening them evenly and
rmly to creat watertight seal
once the membrane installed.
Apply oor mortar to build up the
second mortar bed, the surface
most have minimum drainage
slope of , approximately
1/4" per foot toward the
drain. Leaving space of tile
thickness and thinset along the
seam.
Insert drain body into waste
hole,adjust the height to be
compatible with planned oor,
make sure the height from the
top edge to the coupling plate not
less than 1-1/2".
6
Slope
5
7
After the second mortar bed
cured for 12 hours,install the
oor tile with thinset or tile
adhesive.
8
Fill the gap around the drain body
with slicone bead or grout.Take
away the dustcloth,nalize the
installation by laying the strainer
and grating.
Optional for:
Concrete
Cement mortar bed
Cement backer board
Building paper should be stapled to the plywood oor
before being covered with a galvanized metal mesh.
Mortar bed 2 plus tile and adhesive should be no less than
1-1/2" (40mm)
PVC drain base and waterproof membrane should be
purchased separately.
Note 1
Note 2
Note 3
Clamping Plate
1
Tile or Stone material
Silicon or Grout
Tile Adhesive
Rubber Gasket
Mortar Bed 2
Mortar Bed 1
Plywood
PVC drain base(coupling)
2"waste pipe
3
The following installation steps are applicable for concrete substrate only.
1
Concrete Substrate