NEO-METRO’ INSTALLATION INSTRUCTIONS P.0. BOX 3527 INDUSTRY, CA. 91744 (800) 591-9050 * (626) B55-4854 FAX (626) 837-4725 EOR DROP-IN INSTALLATION: CUT-OUT CHART A= USING BASIN AS A TEMPLATE, PLACE BASIN UPSIDE DOWN ON THE COUNTER TOP AND TRACE AROUND THE EDGE OF BASIN oM A | oms THE BASIN. OFFSET TRACED LINE INWARD 3/4. B~ CUT COUNTER TOP USING THE OFFSET LINE AS GUIDE. 3668/3669 | 144" 144 EXTRA CUTTING MAY BE NECESSARY FOR OPTIONAL FEATURES.