User's Guide
Chapter 2: Server Installation
2-1
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your SERIES3800/S120R-1
(6015B-UR/6015B-U/6015B-NTR/6015B-NT) up and running. Following these
steps in the order given should enable you to have the system operational within
a minimum amount of time. This quick setup assumes that your system has come
to you with the processors and memory preinstalled. If your system is not already
fully integrated with a serverboard, processors, system memory etc., please turn
to the chapter or section noted in each step for details on installing specifi c com-
ponents.
2-2 Unpacking the System
You should inspect the box the SERIES3800/S120R-1 (6015B-UR/6015B-U/6015B-
NTR/6015B-NT) was shipped in and note if it was damaged in any way. If the
server itself shows damage you should fi le a damage claim with the carrier who
delivered it.
Decide on a suitable location for the rack unit that will hold the 6015B-UR/6015B-
U/6015B-NTR/6015B-NT. It should be situated in a clean, dust-free area that is well
ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds are
generated. You will also need it placed near a grounded power outlet. Be sure to
read the Rack and Server Precautions in the next section.
2-3 Preparing for Setup
The box the SERIES3800/S120R-1 (6015B-UR/6015B-U/6015B-NTR/6015B-NT)
was shipped in should include two sets of rail assemblies, two rail mounting brackets
and the mounting screws you will need to install the system into the rack. Follow the
steps in the order given to complete the installation process in a minimum amount
of time. Please read this section in its entirety before you begin the installation
procedure outlined in the sections that follow.