Installation Guide
♦Scheduling reports; Configuration information report function
To detect failure in advance, this function permits you to gather and report regularly the server Configuration
information and any of various logs.
Sending information is gathered in accordance with the following conditions.
<Path: %EsmDir%¥AlertMan¥Work¥WebReport>
<File name: AMHTPHBI>
[Configuration]
- TimeOut=xxxx *Specifies a time out period (sec).
- MaxSize=0 *Specifies an attachable maximal log size (KB).
When ˝0 ˝ is specified, unlimitedly possible.
[Tools]
- Command=˝c:¥xxx¥xxx¥xxx.bat˝ *When ˝˝ (blank) is given, the tool does not operate.
- LogFile=˝c:¥xxx¥xxx¥xxx.log˝
- Directory=˝c:¥xxx¥xxx˝
[Schedule]
- ScheduleType=every month *Specify ˝every month ˝ or ˝every week ˝.
- ScheduleDay=xx
- ScheduleTime=xx:xx
1. In [Configuration] section, specify parameters.
In ˝Timeout ˝, specify number of seconds to stop collecting failure information.
In ˝MaxSize ˝, specify maximal size of collecting failure information log (count by KB).
When ˝0 ˝ is given, unlimitedly possible.
2. In [DefaultTools] section, specify log information for the case of not specifying individual log
commands.
In ˝Command ˝, specify the absolute path of log command.
In ˝Directory ˝, specify the absolute path where the log-gathering command is executed.
In ˝LogFile ˝, specify the absolute path.
When a folder is specified, the files under it (includes subfolders) are collected.
3. In [Schedule] section, specify the timing of gathering information.
In ScheduleType, when ˝every month ˝ is given, the information is gathered every month on the day given in
˝ScheduleDay ˝
In ˝ScheduleDay ˝, specify the date from ˝1 to 31 ˝.
In ˝Schedul
eType ˝, when ˝every week ˝ is given, the information is gathered every week on the day given in
˝ScheduleDay ˝.
In ˝ScheduleDay ˝, specify ˝0 (Sunday) to 6 (Saturday) ˝.
In ˝ScheduleTime ˝, specify the time of gathering information.
In ˝ZZ:WW ˝, specify ˝0 to 23 ˝ in ZZ, ˝0 to 59 ˝ in WW, respectively.
42