Electronics America Server User Manual
Windows Setup 4-3 
SETUP FLOW 
The following flow-chart illustrates 
the flow of the setup procedures for 
the NEC Express5800/320Fb-L(-R) 
server and 320Fb-M(-R) server. 
Corresponding page numbers are 
shown in parentheses. 
:
Entered or selected by the
user
: Proceeds automatically
Ste
p
4: Start the Ex
p
ress Setu
p
(
P.4-14
)
Run [Setup] from NEC EXPRESSBUILDER top menu 
Prepare for Windows Server 2003 R2 Enterprise Edition 
installation and GeminiEngine Control Software installation 
Step 3: Disable Boot Monitoring Function (P.4-9)
Step 2: Prepare for Express Setup (P.4-6)
Step 1: Things Required for Setup  (P.4-4)
Step 11: Enable Boot Monitoring Function (P.4-35) 
Setup completed
Step 13: Back up System Information (P.4-44)
Step 12: Make Settings for Failure Management   (P.4-36) 
- Set memory dump (debug information) 
- Set Dr. Watson 
- Install a network monitor 
- Set Recovery Console
Step 10: Set Network for NEC ESMPRO Agent   (P.4-33) 
Step 9: Create Volume (P.4-33)
Step 8: Connect and Configure Options (P.4-32)
Step 7: Update Software  (P.4-32)
Step 6: Set Dual Disk Configuration (P.4-29)
Step 5: Set Dual LAN Configuration (P.4-21)
Ste
p
5: Set Dual LAN Confi
g
uration  
(
P.4-23
)
Specify the size of the partition for OS installation
Copy OS module to hard disk
Select language for HotFix
Automatic installation starts: 
Windows Server 2003 R2 Enterprise Edition 
GeminiEngine Control Software 
NEC ESMPRO Agent
Insert Windows Server 2003 R2 Enterprise Edition CD-ROM in 
the CD-ROM drive










