Electronics America Server User Manual
4-6 Windows Setup 
Step 2: Prepare for Express Setup 
Before starting Express Setup, be sure to do the following. If these preparations are not done, setup 
cannot be performed properly. 
2-1: Prepare NEC Express5800/ft series 
With the power of NEC Express5800/ft series off, follow the steps below: 
1. Prepare NEC Express5800/ft series. 
x Mount the modules for both systems. 
x Insert only one hard disk to the slot0. 
x Remove all LAN cables. 
x Remove optional SCSI devices such as a tape device from the SCSI connector. 
IMPORTANT: 
Do not mount any hard disk into any slots of any modules unless specified. If multiple 
hard disks are inserted, the hard disk to install OS cannot be determined. 










