User's Guide
2-2 Setting Up the System
Overview
This chapter describes how to select a site, unpack the system, assemble the
rack-mount system unit into a cabinet and install the cable arm assembly.
Information on front and rear panel features, switches, and LEDs are also
included in this chapter.
Selecting a Site
The system operates reliably in a typical office environment.
Choose a site that is:
! Near grounded, three-pronged power outlets.
Note: For the United States and Canada, this means a
NEMA 5-15R outlets for 100-120 VAC or NEMA 6-15R
outlets for 200-240 VAC. For other international sites, this
means three-pronged power outlets applicable for the
electrical code of the region.
!
WARNING
Be sure the power service connection is through a properly
grounded outlet.
!
CAUTION
When two power supplies are installed in the system the
power plug from each of the power supplies must be
plugged into the same common ground power outlets.
! Clean, dust-free, and well ventilated. Front and rear ventilating openings
kept free of obstructions. Away from sources of heat, vibration or
physical shock.
! Isolated from strong electromagnetic fields and electrical noise produced
by electrical devices (such as air conditioners, large fans, large electric
motors, radio and TV transmitters, and high-frequency security devices)
! Spacious enough to provide at least ten inches (25 centimeters) in front of
the system and five inches (13 centimeters) behind the system.
! Easily accessible for system maintenance and installation of system
upgrades.