User's Guide

Setting Up the System 2-11
7. Carefully align the rear holes of the slide rail assembly with the holes in the
rear vertical-mounting rail.
8. Install two screws that secure the rear of the slide rail assembly to the
vertical-mounting rail. See Figure 2-8.
9. Tighten all four screws holding the slide rail assembly to the vertical
mounting rails.
Note:
The screws in the oblong slots of the outer slide
rail may need to be readjusted.
10. Repeat steps 5 through 9 for the mounting the other slide rail assembly on
the right side of the rack cabinet.
A. Vertical mounting rail
B. Rack mounting assembly
C. Alignment tab
D. Screw
Figure 2-8. Installing the Left Slide Rail Assembly into the System Rack