User's Guide
2-10 Setting Up the System
4. Adjust each slide rail to the approximate length measurement determined in
Step 3. The outer bracket adjustment screws (8) may need to be removed
and repositioned. See Figure 2-6, A. Loosely tighten the screws. Final
adjustment will be made once the slide rails are installed into the system
rack.
A
A
Figure 2-6. Adjusting the Slide rail
5. Align one of the slide rail assemblies behind the mounting holes in the
vertical mounting rail (see Figure 2-7) located on the left side of the rack
cabinet. The tabs on the front and rear of the slide rail assembly help to align
it with the holes in the vertical-mounting rail.
6. Install two screws that secure the front of the slide rail assembly to the front
vertical-mounting rail and tighten loosely. See Figure 2-8.
NoYes
Figure 2-7. Installing the Slide rail Assemblies