user manual

ND-46550 (E) CHAPTER 3
Page 17
Revision 2.0
Figure 3-4 Installation Procedure for Remote Site
Cable Running to MDF*
END
START
Mounting of DAIB Card
Unpacking*
Marking and Drilling*
Switch Setting of DAIB Card
Termination of Cables on MDF*
Connection between
Main Site and Remote Site
System Initialization
and System Data Entry*
Operation Test*
Cleaning and Visual Check*
Mounting of Front Cover*
Note 1: This manual describes only the installation procedure exclusively required for the Remote PIM
System. Refer to the Installation Procedure Manual for the procedures marked by * .
Note 2: It is recommended that the Power Failure Transfer (PFT) is provided on the Remote Site in case
the link between the main site and the remote site is lost.
Power Failure Transfer (PFT)
Note 2
Switch Setting of
Line/Trunk Circuit Cards*
Mounting of
Line/Trunk Circuit Cards
See Section 2.2.1
See Section 2.2.2
See Section 2.1.3
See Section 2.3
Switch Setting of DAIC Card
Mounting of DAIC Card
See Section
2.2.4
See Section 2.2.6
See Section 2.2.7
See Section 2.2.9
MP Reset
See Section 2.4
Installation of Main Equipment
Connection of Battery*