2-2 Chapter 2: Preparing the Installation Site
Customer Responsibilities
The customer must do or provide the following:
When required by NCR, provide the NCR customer service
representative with appropriate drawings that indicate:
Fixture Plan showing the location of store fixtures
Floor Plan showing the location of all interior walls, ceiling
heights, and firewalls
Site wiring diagrams for power and communication
Location of other equipment capable of generating electrical
noise, electromagnetic interference, heat, etc.
Environmental conditions that could affect RF communication
Make building alterations necessary to meet wiring and other site
requirements
Provide and install all communications cables, wall jacks, special
connectors, and associated hardware
Provide and install necessary power distribution boxes, conduits,
grounds, lightning protection, and associated hardware
Provide and install auxiliary power or other equipment as required
Provide storage or service areas as required
Make sure that the environmental requirements discussed in this
chapter are met
Provide floor coverings and environmental systems that limit or
control static electricity build-up and discharge
Warning: Make sure all applicable codes, regulations, and laws
(including, but not limited to, electrical, building, safety, and health)
are met.