2-2 Chapter 2: Preparing the Installation Site
Customer Responsibilities
The customer must do or provide the following:
• When required by NCR, provide the NCR customer service
representative with appropriate drawings that indicate:
• Fixture Plan showing the location of store fixtures
• Floor Plan showing the location of all interior walls, ceiling
heights, and firewalls
• Site wiring diagrams for power and communication
• Location of other equipment capable of generating electrical
noise, electromagnetic interference, heat, etc.
• Environmental conditions that could affect RF communication
• Make building alterations necessary to meet wiring and other site
requirements
• Provide and install all communications cables, wall jacks, special
connectors, and associated hardware
• Provide and install necessary power distribution boxes, conduits,
grounds, lightning protection, and associated hardware
• Provide and install auxiliary power or other equipment as required
• Provide storage or service areas as required
• Make sure that the environmental requirements discussed in this
chapter are met
• Provide floor coverings and environmental systems that limit or
control static electricity build-up and discharge
Warning: Make sure all applicable codes, regulations, and laws
(including, but not limited to, electrical, building, safety, and health)
are met.