Installation Instructions Chapter 2
Pre-Installation Procedures 2-7
Example List of Install Tasks
The install process can be broken into distinct functions, but the
execution of these tasks must be carefully choreographed. The
following list gives an example of typical tasks. This manual explains
procedures involving software and hardware installation and testing.
For detailed information on tasks involving project planning, such as
site surveys, see your NCR representative and reference the DecisioNet
System Implementation Guide (497-0002329).
• Site requirements review meeting
• Survey the site to determine store square footage, types of shelving
in existence, types of POS applications used, number of PLU items,
etc.
• POS integration (1st site only)
• DecisioNet software configuration and customization (1st site only)
• Overlay print engine integration (1st site only)
• In aisle Radio Frequency (RF) handheld integration (1st site only)
• Coordinate contractor labor
• Planning meeting and overlay layout
• Scanning equipment arrives at site
• Scan product for EPL data
• Process scan data and send to overlay supplier
• Load EPL Software Base
• Electrical/data cable routing
• Install RS-422 adapter
• CBS and antenna mounting