Installation Instructions Chapter 2

2-6 Pre-Installation Procedures
Phase 5: Install the SmarTalker Tags
Although physical placement of the SmarTalker tags is one of the last
tasks to be completed, preparation is occurring in parallel with Phase 4
of the installation. The SmarTalker installation consists of the
following tasks:
Develop a pre-EPL file in cooperation with the overlay supplier
(Refer to “Phase 2: Scan the Site and Develop SmarTalker
Overlays” in this chapter, and Chapter 10, “SmarTalker and Rail
Installation” or Chapter 11, “SmarTalker II and Rail Installation.”)
Install the SmarTalker rails and clips according to instructions
provided by the manufacturer.
Install the SmarTalker tags (Refer to Chapter 10, “SmarTalker and
Rail Installation” or Chapter 11, “SmarTalker II and Rail
Installation.”)
Load the pre-EPL file and initialize the SmarTalker tags (Refer to
Chapter 9, “Loading the Pre-EPL File.”)
Phase 6: Validate Quality of the Installation
The final phase of the installation process is to ensure the quality of the
installation. Refer to Chapter 12, “Testing the System.”